1) Matters Arising from Last Meetings Action Points
Funding: £5000 applied for. Jo Seaman is doing a key steps draft.
A meeting was held with Jo Witherden regarding the budget
Teresa to print out quantitive results to the team.
2) It was agreed confidentiality is important. A statement would be
issued on Charmouth Notice Board and web site giving a broad indication of analysis progress so far.
3) An analysis document by Jo Witherden was presented to the group
and each point discussed fully. It was noted that a report had been sent out but some present hadn’t received it. Tasks were allocated as a result of the document (see Appendix 1) and it was noted that Planning Consultant Documents were needed.
4) Ros reported that analysis of the quantitative results was complete and
is displayed on pie charts which will be photocopied by Theresa for
next meeting. Some discussion followed.
5) Qualitative Analysis: It was planned to take 25 surveys each and
analyse them according to common instructions. These would be
topic centred with a precis of longer comments.
6) 9th September Forum. Arrangements were discussed, publicity and
presentation. All noted date.
AOB
Ros suggested all future dates of meetings could be sent out by email to all members of the Steering Group by email, and that confirmation of attendance should be required from members.
Thanks were offered to Ros Cole, Andy Bateman, Eden Thomson, and Jo Seaman, for all their work on the quantitive survey.
DONM
The next meeting will be held at The Elms on 22nd August 2017 at 7.30pm.
APPENDIX 1
Potential activities from Jo Witherden’s letter to Carole Girling to progress the Neighbourhood Plan to December.
a) analysing the qualitative results July/August. To be arranged.
b) obtaining the affordable housing needs data (and self build register details) from WDDC (July-August). Simon
c) presenting the results of the survey to date and proposed “way forward” to the community (early September) Set 9th September.Andy & Carole Theresa to do posters.
d) running a call for sites (September/October) Carole Girling
e) undertaking service provider interviews and mapping the community facilities (September-October) Steve and Beth
f) reviewing existing design guidance in the CAA and HTS (September-October) more information required.
g) gathering and analysing other key housing needs data - Census, Land Registry Sales etc. (September-October) Simon and Theresa
h) identifying and mapping the critical footpath network (September-October) Eden and Chris
I) reviewing data collected, confirming the plan’s likely scope, particularly in terms of whether the plan would be likely to allocate any sites for development (November) all